I plan to build an M1126 Stryker ICV, as far as construction is concerned, I'll be shifting from the basic AFV kit & the PE parts. My personal challenge for the build is really with painting & weathering. Hope things work out great!
I started at the onset of July, but I only managed to post now:
Fig.1

These are the kits I will use, a couple are still on the way but you can tell just how much you have to purchase (unless your up to scratch-building the extras). One tip I have for anyone who plans to do the same, consider the Big ED option, you save a lot while still getting the parts you need. I got too jumpy in my shopping!

THE BUILD:
Fig.2

Fig.3

I went through Steps 1-5 following the instructions OOB building the running gear. I must say it was the smoothest assembly of a running gear I have ever experienced. Mostly everything fit together just fine. Mold lines & ejector holes are 'thoughtfully' placed for easy clean up or none at all as these were covered when assembled.
Well that's what's happening so far, more to come...