So I'll start.
I have my base done. I have etched a cobble stone sidewalk out of spare styrene, it's waiting for paint. I have made all the add on stone work, curb stones, stone front stoop, balcony stone trim. Made that in baked clay. I've got my first floor primary wall done and have the door and window opening cut. I did that out of plaster. I have the door and window frames done (out of balsa). I have the door started. I poured the second floor primary wall last night. I have finished the interior floors out of scarp balsa (using the digital diamond method for flooring

My figure has been mainly assembled and I have the face base coated.
Whats left - wow -cut the frech doors out of the second floor. Make the french doors. Make the balcony. Make the stair. Make the windows (cross bar thingies). Make a portion of the roof. Wall paper and interior detail. Assemble the whole thing. Paint the building, weather the building. Let it snow. Paint the figure and put him on sniper duty.
Take the photos, develop the photos and email'em to Keith!
