Nice progress, Richard!
Not much modelling from my side lately-SWMBO said she needs some vacation
So I spent one week away from my modelling room and upon return I found my mojo was still on vacation...
Well, discipline is discipline, even in modelling...
I started construction of the lower part of the bridge laying arm(quite difficult subject, many curved lines, plenty of crossmembers for rigidness).Then moved to the hydraulic cylinders mid support and built the laying cylinder.
Some pictures:
AVLB in transport position

AVLB in deployed position

All laying arm parts are test-fitted.
Some are still not finished, because additional alignment (including with parts to be built) is needed.
While building this subassembly, I realized the set of pictures and drawings I have at hand is not sufficient enough.
Made a search for some manuals.
The original NVA BLG-60M-2 ones cost around 100EUR/111 USD...Mission impossible!
But...
I was lucky to find 2 Bulgarian Manuals-

one for the BLG-60M-2 and one for its Polish version-the BLG-67 for less than 8 EUR/9 USD
Will receive them tomorrow and will continue with my build,